Coming Soon
Tile Installation Fundamentals
Master the essential techniques of professional tile installation through hands-on training. Learn tile layout, precision cutting, thinset application, grouting, waterproofing, and proper installation for floors and walls.
Tuition: $695 USD per student
Course Overview
Master the Fundamentals of Tile Installation
Develop the essential skills needed to install tile with precision and confidence. This beginner-friendly boot camp teaches professional layout techniques, accurate tile cutting, thinset application, waterproofing basics, grouting, and proper installation methods for both floor and wall tile.
Course tuition: $695 USD per student.
Your Class Plan
What You’ll Learn
Teaches layout, straight cuts, mortar handling, setting, and grout on a small dry-area panel. Advanced Tile adds wet-area system detailing, large-format challenges, and diagnostic documentation.
Before you start: No prior tile experience required.
Planned teaching timetable: 8:30 AM–4:30 PM on Day 1 and Day 2, including breaks and lunch. This is the planned class schedule; actual class dates, daily times and venue will be confirmed before enrollment.
By the end, you should be able to
- Check a training substrate and record preparation needs.
- Plan balanced tile layout and calculate basic quantities.
- Make controlled straight/notched cuts using approved equipment.
- Set tile with consistent joints and verify mortar contact against the selected product requirements.
- Grout a cured sample and inspect the installation sequence.
Day 1 — Foundations and guided practice
8:30–9:00
Silica, sharp-edge, wet-tool and lifting controls; station setup.
9:00–10:30
Tile/substrate types, compatibility, layout lines, movement accommodation, and quantities.
10:30–10:45
Break
10:45–12:00
Demonstrate cutting, mixing by instructions, mortar handling, and lifting a sample tile to inspect contact.
12:00–12:45
Lunch and drinks included
12:45–2:15
Dry-lay a small pattern and prepare a cut list before setting.
2:15–2:30
Break
2:30–3:45
Set a floor/wall practice panel; check joints, alignment, and coverage during work.
3:45–4:30
Record preparation, materials, mortar checks, and required cure time.
Day 2 — Application, assessment and next steps
8:30–9:00
Inspect yesterday’s sample without loading or grouting it before it is ready.
9:00–10:30
Grouting and cleanup on pre-cured panels; wet-area waterproofing system awareness.
10:30–10:45
Break
10:45–12:00
Complete a repair/edge-detail sample and compare lippage and joint consistency to the posted criteria.
12:00–12:45
Lunch and drinks included
12:45–2:15
Individually lay out and set a small section, then complete the material/inspection sheet.
2:15–2:30
Break
2:30–3:00
Individual knowledge test: 10 course-specific questions; 20 available points.
3:00–4:00
Individual practical/project assessment, using the course rubric and observations gathered during the project.
4:00–4:30
Feedback, correction plan, certificate eligibility review, and recommended next steps.
Your hands-on project
Lay out and set a small dry-area tile board, demonstrate a lifted-tile contact check, and grout a separately pre-cured sample. Produce a quantity worksheet and curing sequence.
Final knowledge test
Ten questions specific to Tile Installation Fundamentals, covering the skills, decisions, calculations and safety boundaries taught in this course. Each question is worth two points. Pass mark: 16 out of 20 (80%).
The instructor provides the test after training. Approved accessibility support may change how you respond while keeping the same learning standard.
Practical assessment
Complete the course project and demonstrate the skills individually. Five criteria are scored from 0–4. Pass mark: 16 out of 20 (80%), with no criterion below 2 and every critical safety check passed.
What your instructor will assess
- Control dust/cutting hazards and verify substrate readiness.
- Produce a balanced layout and correct quantity/cut plan.
- Make sound cuts and select compatible materials.
- Set the sample to posted joint/alignment standards and verify contact.
- Grout the cured sample and document cure, movement, and inspection needs.
Training boundaries: Wet/dust-controlled cutting only under instructor setup. Grout and finishing use pre-cured samples. A class tile board is not a waterproof shower qualification.
Earn your certificate of completion
- Complete both days and all required learning activities; missed content must be made up.
- Pass the knowledge test and practical assessment separately; a strong score in one does not cancel a failed result in the other.
- Pass every critical safety check and receive the instructor’s sign-off.
If you need more practice, your instructor records the missing skills and assigns focused review and reassessment. Certificates are issued only after all requirements are met.
Your certificate records completion of this Construction Guys course. It is not a contractor license, trade license, or authorization to perform regulated work independently.
Next learning step: Advanced Tile Installation. Your instructor can help you choose based on demonstrated skills.
Course Details
Course Information
Everything you need to know before joining the Tile Installation Fundamentals Boot Camp.
Duration
2-Day Boot Camp
Skill Level
Beginner
Tools Provided
Yes
Training Format
Hands-On
Materials Included
Included
Certificate
Certificate of Completion
Start Your Tile Installation Journey
Join the waitlist and be the first to know when Tile Installation Fundamentals enrollment opens.